Electrical Failure in Chonburi Branch has a problem on yesterday. At the night time of yesterday approximately 21:30 PM – 23:30 PM , Chonburi Branch try to solve this issue by calling generator technician and contact with Local PEA Electrician staff to solve this problem. As generator technician checked , there is no any problem. As local PEA Electrician staff checked , there is not enough for power supply from PEA electrical which we need to switch electrical phase. Flicking light is always happen that make 3 CCTV in CPC Room are out of service ,1 UPS in control room is out of service , MCB Cabinet is occurred very heat which was separated when generator technician maintenance , transformer is exploded and light bulb in front of toilet is black light . I’m not sure that it maybe caused from generator maintenance.