1 Piping and equipment insulation work and material supply those list in Insulation Work Breakdown.
2 Insulation material and accessories specification.
3 Inspection and documentation.
4 Quality and material control.
5 Consumable, tools, equipments, material and etc., which is needed to execute the entire work.
6 Personal protection equipment, shoe, glasses and helmet as minimum.
7 Safety officer (Based on Thai regulation)
8 Working area barricade.
9 Site office, storage and facilities if needed.
10 Working area, site office, storage and facilities area cleaning.
11 Electrical for construction work.