At the end of each week, the production planning department prepares a master production schedule (MPS) that lists which shoe styles and quantities are to produced during the next week. A production order preparation program accesses the MPS and the operations list (stored on a permanent) to prepare a production order for each shoe style that is to be manufactured. Each new production order is added to the open production order master file stored on disk.