Lessons Learned
Integration of the active slab tubing, manifolds, and control systems requires a considerable amount of coordination. Intensive efforts were undertaken with the subcontractors to model all elements intended to be integrated with the concrete slab in order to ensure fit and dimensional tolerance prior to placement. The time required for this level of designer-contractor collaboration needs to be anticipated and built into the construction schedule.