Thank you very much for clarification on scope of work. As per talked via phone, I would like you revise the details & quotation and appreciate if return to me before Wednesday noon as follows;
• Item 2.07 Vinyl Tile removal Only to repairing Work room1 = 15 SQM
• Item 2.08 Require the aluminums skirting instead of PVC edging
I would like to separate the quotation as details following for repair the next year. (Vinyl work, All Wooden Modular/ Built-in cabinet)
• Item 2.07 Vinyl Tile removal
I. Pantry = 55 SQM
II. Central Filing room = 32 SQM
III. Work area 2 = 25 SQM
IV. Pharmacy Filing room = 7 SQM
V. Finance Filing room = 10 SQM
• Item 2.09 Supply and install new wooden vinyl tile to Pantry area
• Item 2.11 Supply and install new standard vinyl tile to affected existing vinyl tile location
• Item 3.02 Repair for all Wooden Modular Cabinet
• Item 3.03 Repair for all Wooden Built-in Cabinet
Any unclear, please feel free contact me anytime. Thank you!!