The proportion of canopy cover was estimated along the transect (200 m length) in each
plot using a spherical densiometer. Litter depth wasalso measured in centimetres at each site. Bothcanopy cover and litter depth were measured at36 points along the pipeline transect and at 36points in the natural forest sites