Due to the 25 / 09 / 2016 orders from TPC to send VCM from Tank O-FA811C to TPC number 300 ton has ordered Fill operator. Out of the Line VCM arranged to send and began sending time 21.52.And see that there has been an increase in Tank O-FA811B arise when 23.10. Therefore stop temporarily to examine the cause was found there. Vale No. 9 of Tank O-FA811B off not cleave 1. Without Valve open slightly.Make VCM passing into the 83 ton and inform the TPC acknowledge time 23.15. It already preliminary and VCM sent to the TPC. Then 217 ton also lack the into the Tank O-FA811B and TPC told me.The drop-off 300 ton and ask for more 100 ton. When the check and modify the Valve No.9 all already and was informed TPC again that time 23.30 PM is starting. VCM to the TPC according to number.Until...The problem is then charged with Fill operator as guidelines for the next time that if there are various Move ให้ทำการ check all relevant Valve always before sending every time.