Please you help me re-assemblies for 6600136 around 2 pcs.
And please you told the operators should be careful when they assembly.
So, If possible when we have the new product/new model, please you produce when I’m free time for support you.
However, for next time I think we should assembly by step as below.
1. Engineering team request time to production windows for support
2. If production can’t support by the date that engineer request, should be inform back for a day can produce.
3. Engineering team and production produce the glass together (look at all process and study the problem that may happen along the way that we produce)