Dear khun Alex
There are many defects that room division (Eng, H/K,F/o) is checking and Eng klapsons rectifying
Please see attached file karb.
Defect Room.(Contractor)
Room 2514 Cutting out ceiling laminate = follow up Contractor ( 15/3/15 )
Room 2715 Cutting out ceiling laminate = follow up Contractor ( 17/3/15 )
Room 2612 Air conditioner in bedroom still running when = follow up Contractor ( 6/5/15 )
Room 2711 Laminate flooring probem = follow up Contractor ( 7/4/1 5)
Room 2709 No box to keep electric line = DONE 13/7/15
Room 2601 Corridor wall swelled up = follow up Contractor ( 15/5/15 )
Room 2701 Broken cabinet = follow up Contractor (21/5/15)
Room 2702 Water leak in master bathroom and drain problem = follow up Contractor ( 3/6/15 )
Room 2610 Repair cabinet under the sink & fix wood swelling = follow up Contractor (22/4/15 )