The State Power Corporation of China has been issued “An emergency treatment counter plan about the power
equipment of Jiangxi Province Electric Power Company in wide range damage” on 21st June 2006. The main
purpose of the plan is to handle and control a large fan power facilities surrounding damage accurately and
timely. Meanwhile, the plan also is to minimize and eliminate the impact and losses of the accident, ensure
safety in production of the grid and maintain the electricity supply of the society. However, the content of the
plan is the principle provisions and lack of the implementation capacity of provisions. Thus, it is necessary to
formulate specific measures when the emergency material cannot be timely supplied by the province [2].
These measures involve in the following aspects. First of all, the department of material assurance could rush
to the China State Grid Corp Bidding Center for a support. Then the Center could collect the inventory survey of
other provinces’ electric power company and pole manufactures and provides the information to the material
assurance department of anti ice rescue in Jiangxi Province. Secondly, Central China Power Supplies Company
should play a role of regional advantages and keep close to the engineering department and technology department.
Meanwhile, the company also should maintain a communication with those key manufacturers who
mainly produce the facilities and components of accident repair. This can ensure the disaster relief supplies and
relevant personnel in disaster area timely and accurately. Overall, Jiangxi Province Electric Power Company
should prearrange the relief materials and equipments, keep contact with the preferred and alternative suppliers,
and power grid supply department of other provinces to ensure the scheduling purchase and distribution of urgent supplies. Finally, the optimum scheme of the emergency supply can be established.