Due to its low weight, and small foot print coupled to its modular design the CiBAS WHRU is ideal for retrofitting onto existing Platforms or FPSOs to replace a Traditional WHRU or to where a gas turbine is available to increase the facilities process heat supply
Case Study
The client when planning to tie back a number of additional fields that it had discovered and developed to an already operating offshore processing facility. The Client had calculated that the additional product flow through the processing plant would exceed the current process heat rising capability.
However on the facility there was a gas turbine driven compressor set that was at that time running in open cycle mode which could be utilised to recover heat from providing that a WHRU could be installed into the space that was taken up by the silencer, stack and support steel-work.