The cause of problem : There was power issue (Short
circuit) in Amata City node (last exchange) . GPON, Switch, Gigabit, SDH, MSAN were impacted from this incident.
The action taken : Replacing the new drop wire, optical fiber that was burnt by fire.
duration of work on problem solving : The circuits were
on Switch up at 14.00 LT 16/2/2015
The circuits were
on GPON up at 17.45 LT 16/2/2015
Some circuits were up after replacing the new drop wire and optical fiber during 19.00-21.00 LT 16/2/2015
***Ticket No: 22831/2015 CAT ID: WDW115334 Name: