As stated in Chapter 3, you should not stop with this brainstorming list and discussion. Conduct a follow-up exercise by having each team member independently work through the brainstorming list to categorize each problem into the eight wastes of Lean (see Quality Glossary at the end of the book). Each team member should write down which of the eight wastes apply to each problem listed. More than one waste can be assigned to a problem.