1.26 Are the incoming materials held until the required inspections/tests are completed and labeled?
1.27 Are lots stamped as appropriate after completing acceptance inspection? (e.g., Accept, Reject stamp)
1.28 Are materials/lot passed incoming inspection properly stored to prevent damage?
1.29 Are the non-conformance materials identified, recorded, and segregated?
1.3 Is non-conformance analyzed by appointed person?