Dear Jujak Team,
Please advise if it is possible to swap the Hot Water space and the Server space around so as the installation of the Rack can proceed on Monday 11th. If so the Rack position there will be less prone to damage. Maybe we could build the front and RHS wall out of the light weight steel profile and line it with cement sheet or plaster. Attached is a photo of the area, which will need clearing now.