Mechanical preservation A1 Note:Ensure that equipment is not energized การแปล - Mechanical preservation A1 Note:Ensure that equipment is not energized ไทย วิธีการพูด

Mechanical preservation A1 Note:Ens

Mechanical preservation
A1 Note:
Ensure that equipment is not energized other than for heating or pressurized and that safety precautions are followed.

Shafts on rotating equipment which are not locked shall be rotated 1 ¼ turn in the rotating direction to avoid brine ling when located in one position for long periods make sure that the new shaft position varies from check to check. Bearings with lube oil housing check level is adequate prior to rotation.

Check that comportment heater into gas turbine housing is working
Check that all preservation heading are energized and working
Check and report that preservation of control; Instrument, switchgears room, quarters and officers are maintained as per preservation requirement.
Check that all filled liquid have correct level and added with antifreeze when needed
Check storage and preservation condition on all mechanical shipped loose equipment.
Check nitrogen pressure if filled.
Check and report that duct blinds are fitted on nozzle in and out from skids a single item of equipment and on pipe ends and ducts. If pipes are hooked up to any equipment in term gravity sheet metal blind with ample size red painted handle shall be inserted between the end flange faces.
Check and report that painted and machine surfaces, which shall be coated with preservative wax or oil are maintained.
Check and report that the protective standing roof or ply rool cover which shall be fitted are maintained.
Check and report any discrepancies or damage occurring during contract period for all mechanical equipment.

Open up access hatch or inspection nozzles check and report internal condition of surfaces and entering personation on carbon steel coolers heater crude/gas maters, tanks and vessels, centrifugal, screw reciprocating compressors.

Rotating equipment
Which have no. pipes connected to inlet and outlet nozzles to be blinded with 6 mm steel plate with 2 mm rubber gasket, where pipes are connected to inlet and out nozzles DUST BLINDs shall be installed.

Centrifugal Compressors
Unit Installation the compressor can be stored outside it the packing is suitable for minimum 6 months outside storage. It the compressor is stored in the warehouse no H/AC is required, check that no enter is trapped in the crate or in any cover. The Pisin and thrust bearings shall remain in place coated with preventative all, Tectyf testy 502C or equal.

Drums
Internal carbon steel surfaces of pressure vessels shall be preserved by either nitrogen of dry air (dew port
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
Mechanical preservation A1 Note:Ensure that equipment is not energized other than for heating or pressurized and that safety precautions are followed.Shafts on rotating equipment which are not locked shall be rotated 1 ¼ turn in the rotating direction to avoid brine ling when located in one position for long periods make sure that the new shaft position varies from check to check. Bearings with lube oil housing check level is adequate prior to rotation.Check that comportment heater into gas turbine housing is workingCheck that all preservation heading are energized and workingCheck and report that preservation of control; Instrument, switchgears room, quarters and officers are maintained as per preservation requirement.Check that all filled liquid have correct level and added with antifreeze when neededCheck storage and preservation condition on all mechanical shipped loose equipment.Check nitrogen pressure if filled.Check and report that duct blinds are fitted on nozzle in and out from skids a single item of equipment and on pipe ends and ducts. If pipes are hooked up to any equipment in term gravity sheet metal blind with ample size red painted handle shall be inserted between the end flange faces.Check and report that painted and machine surfaces, which shall be coated with preservative wax or oil are maintained.Check and report that the protective standing roof or ply rool cover which shall be fitted are maintained.Check and report any discrepancies or damage occurring during contract period for all mechanical equipment.Open up access hatch or inspection nozzles check and report internal condition of surfaces and entering personation on carbon steel coolers heater crude/gas maters, tanks and vessels, centrifugal, screw reciprocating compressors.Rotating equipmentWhich have no. pipes connected to inlet and outlet nozzles to be blinded with 6 mm steel plate with 2 mm rubber gasket, where pipes are connected to inlet and out nozzles DUST BLINDs shall be installed.Centrifugal CompressorsUnit Installation the compressor can be stored outside it the packing is suitable for minimum 6 months outside storage. It the compressor is stored in the warehouse no H/AC is required, check that no enter is trapped in the crate or in any cover. The Pisin and thrust bearings shall remain in place coated with preventative all, Tectyf testy 502C or equal.DrumsInternal carbon steel surfaces of pressure vessels shall be preserved by either nitrogen of dry air (dew port <-30 C) pressure with 0.2 to 0.3 drag internal carbon steel surfaces of atmosphere tanks that be preserved by a continuous with dry air (dew point <-30 C).At pressure vessels, heat exchangers and tanks shall be installed with DUST BLINDs or permanent blinds, the equipment nozzles.The DUST BLINDs shall be removed switched over in case of permanent spectacle binds or the permanent spacers installed, after the correcting lines have been cleaned are dried according requirement.Area related check:Check for physical damage and damage presentation protection
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
Mechanical preservation
A1 Note:
Ensure that equipment is not energized other than for heating or pressurized and that safety precautions are followed.

Shafts on rotating equipment which are not locked shall be rotated 1 ¼ turn in the rotating direction to avoid brine ling when located in one position for long periods make sure that the new shaft position varies from check to check. Bearings with lube oil housing check level is adequate prior to rotation.

Check that comportment heater into gas turbine housing is working
Check that all preservation heading are energized and working
Check and report that preservation of control; Instrument, switchgears room, quarters and officers are maintained as per preservation requirement.
Check that all filled liquid have correct level and added with antifreeze when needed
Check storage and preservation condition on all mechanical shipped loose equipment.
Check nitrogen pressure if filled.
Check and report that duct blinds are fitted on nozzle in and out from skids a single item of equipment and on pipe ends and ducts. If pipes are hooked up to any equipment in term gravity sheet metal blind with ample size red painted handle shall be inserted between the end flange faces.
Check and report that painted and machine surfaces, which shall be coated with preservative wax or oil are maintained.
Check and report that the protective standing roof or ply rool cover which shall be fitted are maintained.
Check and report any discrepancies or damage occurring during contract period for all mechanical equipment.

Open up access hatch or inspection nozzles check and report internal condition of surfaces and entering personation on carbon steel coolers heater crude/gas maters, tanks and vessels, centrifugal, screw reciprocating compressors.

Rotating equipment
Which have no. pipes connected to inlet and outlet nozzles to be blinded with 6 mm steel plate with 2 mm rubber gasket, where pipes are connected to inlet and out nozzles DUST BLINDs shall be installed.

Centrifugal Compressors
Unit Installation the compressor can be stored outside it the packing is suitable for minimum 6 months outside storage. It the compressor is stored in the warehouse no H/AC is required, check that no enter is trapped in the crate or in any cover. The Pisin and thrust bearings shall remain in place coated with preventative all, Tectyf testy 502C or equal.

Drums
Internal carbon steel surfaces of pressure vessels shall be preserved by either nitrogen of dry air (dew port <-30 C) pressure with 0.2 to 0.3 drag internal carbon steel surfaces of atmosphere tanks that be preserved by a continuous with dry air (dew point <-30 C).
At pressure vessels, heat exchangers and tanks shall be installed with DUST BLINDs or permanent blinds, the equipment nozzles.

The DUST BLINDs shall be removed switched over in case of permanent spectacle binds or the permanent spacers installed, after the correcting lines have been cleaned are dried according requirement.

Area related check:
Check for physical damage and damage presentation protection

การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
การดูแลรักษาเครื่องจักรกล

หมายเหตุ : A1 ให้แน่ใจว่าอุปกรณ์ที่ไม่ได้เป็น energized นอกจากความร้อน หรือแรงดัน และมาตรการป้องกันความปลอดภัย ปฏิบัติตาม

เพลาบนหมุนอุปกรณ์ที่ไม่ได้ล็อคจะหมุน 1 ¼หันไปในทิศทางการหมุนเพื่อหลีกเลี่ยงน้ำเค็ม หลิง เมื่ออยู่ในตำแหน่งเดียวเป็นเวลานานให้แน่ใจว่าเพลาใหม่ ตำแหน่งที่แตกต่างจากการตรวจสอบเพื่อตรวจสอบตรวจสอบระดับน้ำมันหล่อลื่นลูกปืนกับที่อยู่อาศัยที่เพียงพอก่อนที่จะหมุน

ตรวจสอบความประพฤติเครื่องกังหันก๊าซมีที่อยู่อาศัยในการทำงาน
ตรวจสอบว่ารักษามุ่งหน้าเป็น energized และงานตรวจสอบและรายงาน
รักษา ควบคุม อุปกรณ์ ห้องพัก switchgears , และเจ้าหน้าที่รักษาตามความต้องการของการเก็บรักษา
ตรวจสอบว่าเติมของเหลวจะมีระดับถูกต้อง และเติมสารเมื่อต้องการตรวจสอบกระเป๋าและสภาพการเก็บรักษาต่อ

จัดส่งหลวมทั้งหมดเครื่องจักรกลอุปกรณ์ ตรวจสอบความดันของแก๊สไนโตรเจน ถ้าเต็ม ตรวจสอบและรายงานว่าท่อ
ผ้าม่านติดตั้งบนหัวและออกจากแคร่หนึ่งรายการของอุปกรณ์และที่ปลายท่อและท่อ .ถ้าท่อจะติดยาเสพติดไปยังอุปกรณ์ใด ๆตามแรงโน้มถ่วงระยะแผ่นโลหะตาบอดเล่นสีแดง ขนาดทาสีด้ามจะถูกแทรกระหว่างปลายหน้าแปลนหน้า ตรวจสอบและรายงาน
สีและพื้นผิวเครื่อง ซึ่งจะถูกเคลือบด้วยขี้ผึ้ง หรือน้ำมันบูดจะรักษา .
ตรวจสอบและรายงานว่าหลังคาหรือฝาเกลียว rool ยืนป้องกัน ซึ่งจะติดตั้ง
จะรักษาตรวจสอบและรายงานความขัดแย้งใด ๆหรือความเสียหายที่เกิดขึ้นในช่วงระยะเวลาของสัญญาทั้งหมดอุปกรณ์เครื่องจักรกล

เปิดเข้าฟัก หรือการตรวจสอบหัวฉีดตรวจสอบและรายงานภายในสภาพของพื้นผิวและการเข้าแปลง ยีคาร์บอนเหล็กเย็นเครื่องทำน้ำอุ่นก๊าซดิบ / maters รถถังและเรือ , หอยโข่ง , สกรูคอมเพรสเซอร์แบบลูกสูบหมุน


อุปกรณ์ที่ได้มีท่อที่เชื่อมต่อกับท่อหัวฉีดเต้าเสียบที่จะตาบอดด้วยแผ่นเหล็ก 6 มม. กับปะเก็นยาง 2 มิลลิเมตร ซึ่งท่อเชื่อมต่อขาเข้าและออกหัวฉีดฝุ่นผ้าม่านจะต้องติดตั้งพัดลมดูดอากาศคอมเพรสเซอร์
.

ติดตั้งหน่วยคอมเพรสเซอร์สามารถเก็บไว้นอกมันบรรจุเหมาะสำหรับขั้นต่ำ 6 เดือนนอกกระเป๋า . มันคอมเพรสเซอร์จะถูกเก็บไว้ในโกดังไม่ H / AC ที่จําเป็นตรวจสอบว่าไม่มีระบุถูกขังอยู่ในกรง หรือ ในปก การ pisin และแบริ่งแรงผลักดันจะยังคงอยู่ในสถานที่เคลือบป้องกันทั้งหมด tectyf น้อยใจ 502c หรือเท่ากับ


ภายในกลองเหล็กคาร์บอนพื้นผิวของภาชนะแรงดันจะถูกเก็บรักษาไว้โดยให้ไนโตรเจนจากอากาศแห้ง ( น้ำค้างพอร์ต < - 30 องศาเซลเซียส ) ความดัน 0.2 03 ลากภายในเหล็กคาร์บอนพื้นผิวของบรรยากาศรถถังที่จะรักษาโดยต่อเนื่องกับอากาศแห้ง ( จุดน้ำค้าง < - 30 องศาเซลเซียส ) .
ที่ความดันเรือ , แลกเปลี่ยนความร้อนและรถถังจะติดตั้งผ้าม่านหรือมู่ลี่ติดถาวร อุปกรณ์หัวฉีด

ฝุ่นผ้าม่านจะถูกเปลี่ยนไปในกรณีของยา ปรากฏการณ์ถาวรหรือถาวร spacers ติดตั้งหลังจากการแก้ไขเส้นได้รับการทำความสะอาดแห้งตามความต้องการ พื้นที่ที่เกี่ยวข้อง :

เช็คตรวจสอบความเสียหายทางกายภาพและป้องกันความเสียหาย

เสนอ
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2025 I Love Translation. All reserved.

E-mail: