Failure to do this increases the potential for failure. Cost overruns, missed deadlines, loss of interest, waning urgency all result from poor planning. Potential for error: “making decisions based on delusional optimism rather than on a rational weight of gains, losses, and probabilities,” (page 252). In other words, poorly planned grandiose projects will eventually fail.