During asphalt paving, the average temperature of the asphalt
behind the screed when industrial hygiene sampling occurred
was 150 C (sd = 6.0). Collection of fumes above the tank holding
the paving asphalt (used in this bioassay) occurred at an average
temperature of 148 C (sd = 2.0).