The circuits of infrastructure distribution are made above the service corridor ceilings and through the shafts of the vertical access cores. Since, in the future, there will be two independent blocks of rooms, it will be possible to only use one depending on the occupancy rate that is established in each season of the year, thus substantially decreasing the costs for cleaning and heating of the spaces. The embankment which forms the high square can absorb all the non-polluting debris from the demolition of the existing constructions, as well as the excess dirt resulting from the excavation for implanting the new constructions, avoiding economic and environmental costs which would be a result of the transporting of the waste to landfills