Refer to EIA requirement aspect to Coastal water quality mentions that “ Weekly monitoring of suspended solid (SS) during low tide at 300 southern of jetty construction area shall be conducted, in case of (SS) concentration is exceeding the standard, jetty construction shall be stopped.”
It very important, so IPC needs to closely check the result with UAE and report to PMC/PTTLNG by weekly basis to ensure that (SS) compliance with regulation and haven’t any unexpected value.