MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES
Mineral resources are reported for Kupol and Vtoryi II, and mineral reserves are
reported for Kupol only. For Kupol, vein, stockwork, dykes, basalt units, and major
faults within the vein/stockwork area were interpreted on north facing cross sections
spaced 10 to 100 m apart, depending upon local drill hole spacing. For Vtoryi II, the
vein was interpreted on northwest-facing 25 m spaced sections. All interpretation work
was based on logged geology, and only occasionally on assay grade (if doing so was
supported by local vein/stockwork geometries). The final interpretation and wireframes
are the culmination of many iterations (and intense review) of the process which
included wireframe (solid model) construction from sectional interpretations, slicing on
25 m spaced levels, review on section and level, and modifications to the
interpretation.
Logged intervals and blocks were coded from the vein, stockwork, dyke, fault, and
basalt wireframe models. High gold and silver assays were capped (cut) before
calculating down-hole composites. Capped and uncapped grades were estimated into
blocks using an inverse-distance algorithm. The block grade estimates were checked
visually on screen and on plotted cross sections (composite grades relative to block
model grades), comparison of the Inverse Distance Squared (ID2
) or Ordinary Kriging
(OK) estimates and declustered composite distributions (nearest neighbour), block
model statistics, and analysis of grade profiles by northing and elevation.
Mineral resources are categorized using the classification of the Canadian Institute of
Mining, Metallurgy and Petroleum (2005). At Kupol, Indicated Mineral Resources are
estimated where drill holes or trenches intersect the vein(s) at approximately 50-metre
spacing on a vertical longitudinal projection. Inferred Mineral Resources are estimated
down-dip and along strike from Indicated Resources in areas that have been drilled on
approximately a 100 m spacing on a vertical longitudinal projection. For Vtoryi II,
Inferred Resources are estimated where data spacing is approximately 50 m.
MINERAL RESOURCE AND MINERAL RESERVE ESTIMATESMineral resources are reported for Kupol and Vtoryi II, and mineral reserves arereported for Kupol only. For Kupol, vein, stockwork, dykes, basalt units, and majorfaults within the vein/stockwork area were interpreted on north facing cross sectionsspaced 10 to 100 m apart, depending upon local drill hole spacing. For Vtoryi II, thevein was interpreted on northwest-facing 25 m spaced sections. All interpretation workwas based on logged geology, and only occasionally on assay grade (if doing so wassupported by local vein/stockwork geometries). The final interpretation and wireframesare the culmination of many iterations (and intense review) of the process whichincluded wireframe (solid model) construction from sectional interpretations, slicing on25 m spaced levels, review on section and level, and modifications to theinterpretation.Logged intervals and blocks were coded from the vein, stockwork, dyke, fault, andbasalt wireframe models. High gold and silver assays were capped (cut) beforecalculating down-hole composites. Capped and uncapped grades were estimated intoblocks using an inverse-distance algorithm. The block grade estimates were checkedvisually on screen and on plotted cross sections (composite grades relative to blockmodel grades), comparison of the Inverse Distance Squared (ID2) or Ordinary Kriging(OK) estimates and declustered composite distributions (nearest neighbour), blockmodel statistics, and analysis of grade profiles by northing and elevation.Mineral resources are categorized using the classification of the Canadian Institute ofMining, Metallurgy and Petroleum (2005). At Kupol, Indicated Mineral Resources areestimated where drill holes or trenches intersect the vein(s) at approximately 50-metrespacing on a vertical longitudinal projection. Inferred Mineral Resources are estimateddown-dip and along strike from Indicated Resources in areas that have been drilled onapproximately a 100 m spacing on a vertical longitudinal projection. For Vtoryi II,Inferred Resources are estimated where data spacing is approximately 50 m.
การแปล กรุณารอสักครู่..

ทรัพยากรแร่และแร่สำรองประมาณการ
ทรัพยากรแร่และมีรายงาน kupol vtoryi II และสำรองแร่
รายงาน kupol เท่านั้น สำหรับ kupol , เส้นเลือด , stockwork เลสเบี้ยน , หินบะซอลต์หน่วย และผิดหลัก
ภายในพื้นที่หลอดเลือดดำ / stockwork ถูกตีความบนกางเขนส่วนทิศเหนือห่างกัน 10
100 เมตร ขึ้นอยู่กับท้องถิ่นเจาะหลุม ระยะปลูก สำหรับ vtoryi
2หลอดเลือดดำถูกตีความในตะวันตกเฉียงเหนือซึ่งระยะ 25 เมตรส่วน ทั้งหมดขึ้นอยู่กับการตีความ
เข้าสู่ระบบธรณีวิทยา และบางครั้งบางคราวในเกรด assay ( ถ้าทำงั้น
สนับสนุนโดยโครงสร้างหลอดเลือดดำ / stockwork ท้องถิ่น ) การตีความขั้นสุดท้ายและ wireframes
เป็นสุดยอดของหลายรอบ ( และตรวจสอบเข้ม ) ของกระบวนการซึ่ง
รวมกรอบ ( แบบแข็ง ) การก่อสร้างจากการตัด , หั่นบน
25 เมตรระยะระดับความคิดเห็นเกี่ยวกับระดับส่วน และปรับเปลี่ยนให้
ต้องตีความ ช่วงเวลาและบล็อกรหัสจากเส้นเลือด , stockwork , ประหลาด , ข้อผิดพลาด , และ
basalt wireframe แบบจำลอง หรือทองและเงินสูงถูกปกคลุม ( ตัด ) ก่อน
คำนวณ down-hole คอมโพสิตปกคลุมและเกรด uncapped ประมาณใน
บล็อกโดยใช้อัลกอริทึมระยะทางผกผัน บล็อกระดับประมาณการดู
มองเห็นบนหน้าจอและวางแผนข้ามส่วน ( เกรดรวมญาติบล็อก
เกรดรูปแบบ ) , การเปรียบเทียบระยะทางผกผันยกกำลังสอง ( ไอดีทู
) หรือสามัญคริกกิ้ง
( OK ) และการประมาณการ declustered คอมโพสิต ( ใกล้เพื่อนบ้านบล็อก
)สถิติแบบจำลองและการวิเคราะห์สภาพเกรดโดยทางเหนือและระดับความสูง .
ทรัพยากรแร่จะแบ่งการใช้ประเภทของสถาบันของแคนาดา
เหมืองแร่โลหะ และปิโตรเลียม ( 2005 ) ที่ kupol พบแหล่งแร่เป็นประมาณการที่หลุมเจาะหรือสนามเพลาะ
ตัดหลอดเลือดดำ ( s ) ประมาณ 50 เมตร ระยะห่างในแนวตั้ง
ตามยาวฉายมีทรัพยากรแร่ประมาณ
ลงจุ่มและพร้อมโจมตีจากพบทรัพยากรในพื้นที่ที่ได้รับการเจาะใน ประมาณ 100 เมตร ระยะห่าง
ในแนวตั้งและฉาย สำหรับ vtoryi II
มีทรัพยากรที่เป็นข้อมูลอยู่ที่ประมาณระยะห่างประมาณ 50 เมตร
การแปล กรุณารอสักครู่..