The Process Flow for a Quality Alert System is shown in Fig. 17-3. The process begins with the activation of a trigger (i.e. an operator pushes an Andon Call button in his or her station). The PLC is responsible for tracking the unit position and continuously monitoring where the unit is within the station through the use of tracking encoders on that conveyor.