I would like to inform you about GMS System. In the last year, I haven’t worked closely with the GMS, but this year me and Paan began to more closely. And met this system has quite a lot of problem of work. I my opinion, GMS system is not stability. During the past , that I worked with GMS we found the fastidious problem always. Some issues don’t not believe that has a met occur GMS, that make me feel that system has not been tested before send to ours. Please find attachment. This is some problem that we found in period prepare the GMS system for training on next Monday. We take the time 3 week to solve the any issues, some issues can be solve, some issues still during to find solution. I think GMS system should be improved a lot in the future.
Summary of issues found in the period configuration and test GMS, until September 9, 2016
1. GraphOn for control GMA laptop also found issues the program is responding slow when compared used the program on AOI machine.
2. Tablet Sync data: We still found the issues data sync, such as we setup and control by disable some date, some filed and some module. Define for don’t show on interface the program, but after we are setup and sync new configuration to table, that some filed and data that we disable it still show don’t diaper, it will be we to restore system and sync again and again to many time.
3. GMA Tablet found the issues by not sending E-mail on the topic “Farm monitoring”. The normally after FT to do something complete the GMA system must be send E-mail report to supervisor or up on the system setup.
4. GMS system test version found the issues about show farmer data on more one tablet. So normally GMS system after assigned farmer to one FT should not show on another tablet . That should be show farmer data on only FT tablet that supervisor assigned only.
During the test system we met any issues more frequently and Delta often take a long time to fix it. Make we take time to install fix program and have time to tested is less. And now we still waiting Delta and AOI to solve some issues, and after that we must restore database and Sync update GMS new version to the table 34 machine. Could you can allow O.T. for my team on Friday and Saturday? If we will can’t prepare the GMS system completely on working hours, before will going to Sukhothai on next Monday.