I wanted to check if it possible for us to proactively stop the standard SSP contracts beyond (9 months + 3 grace) months to get saved in SERVIS2 in future? Currently the contract got saved in system and then got lapsed.
If it is possible to have such a control, then can I raise a ticket? Please advise.
Thanks