1) Should an outstabling location on the mainline or the Stabling Sidings in the depot be involved in a scheduled Track Possession, the Maintenance Planner must consult the Train Operations Department in advance for alternative arrangement to be made by CCR in conjunction with the Train Crew Controller (TCO) and the respective Station Controller (SC).