About the mining project,amount of investment can change according to the size of the operation.
1.For a medium size of operation, size of 1800-2000 Tons/Day, total investment required is 8,875,689 USD. Net monthly income after deducting tax and operation expenses 5,780,313 USD/Month.
2.For a smaller size of operation, size of 1800-2000 Tons/Day, total investment required is 8,875,689 USD. Net monthly income after deducting tax and operation expenses 5,780,313 USD/Month.
3.It is also possible to start with small operation for lower budget, but the production and income will drop much lower.
Please note; as larger is the operation and size, it means higher production per day, which means higher income. I can also propose a big operation, if they have the investment.
Above estimates are only for start mining in one Block of license. The size of on block is 1200 acre (4.86 Square Kilometer).
All block are already exploration study complete.
关于采矿项目,投资金额可以更改尺寸的操作。1.对于一个中等大小,大小为 1800年-2000年吨/天,所需的投资总额是操作的 8,875,689 美元。每月净收入扣除税和操作费用 5,780,313 美元/月。2.以减小其大小的操作,大小为 1800年-2000年吨/天,所需的投资总额为 8,875,689 美元。每月净收入扣除税和操作费用 5,780,313 美元/月。3.它也是较低的预算,可能,开始与小手术,但生产和收入将降低得多。请注意 ;如更大的操作和大小,这意味着更高的生产,每一天,这意味着更高的收入。我也可以提出重大的手术,如果他们有投资。以上估计仅为开始采矿许可证的一个块中。块的大小是 1200 英亩 (4.86 平方公里)。所有的块都已完整的探索研究。
การแปล กรุณารอสักครู่..