• Once the bore has reached the required distance, the drill pipe and bit are removed
from the well. Production casing is then inserted in to the full length of the well. This
process permanently secures the well bore, preventing hydrocarbons and other
fluids from seeping out in to the geological formation. Testing is carried out at this
stage to monitor the well and to ensure that it is safe.