Erosion and sedimentation should be controlled during the construction of the project components such as dam, powerhouse etc. Wherever possible, land clearing and vegetation removal should be conducted in as small a footprint as possible to ensure as much of the original ground cover is maintained in its existing condition. Suitable measures to control sedimentation and erosion resulting directly or indirectly from the project include the following practices: