Where there is no NCM available, and the design team decide against an alternative modelling approach (see CN3.2), the energy performance of the building can be determined using Checklist A5.
Up to 10 credits
2
A Suitably qualified energy modelling engineer or accredited professional has used Checklist A5to determine the number of credits awarded for this issue.
3
The Suitably qualified energy modelling engineer or accredited professional has confirmed the items selected within Checklist A5 are appropriate to the building type and local climatic conditions to award a maximum of 10 of the available credits.