We have checked with SG and got information that stock of Hostastat FE 20 Liq (PO# 16801823 OP) will be available on the week of 5-9 Dec 2016 only, so the estimate prompt shipment will be ETA on Dec 21.
However, the rest items in both PO are ready to ship.
PO#16801823 OP : 500kg Hostavin ARO8
PO#18019380 OP : 1,000kg Hostavin N30, 1,000kg Licowax C/ 1,440kg FE20 is not available.
What do you think if we arrange the shipment for ready material first, ETA around 09.12.2016 and ship FE 20 to ETA around 06.01.2017?
Please consider and advise ka.