There is existing rectifier installed in the existing BTS room on the 6 floor. The newly installed node B will be supplied with DC power from the existing rectifier. Breakers of Airport Operation Building will be added inside the existing rectifier enclosure. Power cables will be installed to supply DC power to all installed RHUB in each riser.