Dear: Khun Stanley
Please find the attachment the location for building A and B temporary power and water for contractor.
To better control the power and water usage by contractor, I recommend that HHT provide our own main power distribution panel with meter, one on each working area. And for good measure contractor should have their own panel with meter to connect to our. Same with water, HHT can provide one main water access point with meter for each working area for contractor usage. All cost from power and water could then be back charge to contractor per their usage.