5.9 Presentation of results
The presentation of the inspection results takes place in a suitable place/facility.
Moderation and failure presentation is performed by QA - Engineering Control System 2. Involved and
required for participation are representatives from relevant production station, relevant production
line management, representatives from Engineering and QM department PMG and MB-PMG.
The presentation time is limited max. 45 min. (depending on failure amount)
Necessary measures are required by 8D (DS/DZ or series defect from dynamic check and/or
repeated single fault) report by Control System 2 Center Manager supported by QM department.
Control System 2 Reporting
Q-Engineering Control System 2 prepares the reports by shops in following periods:
Daily report by failure F/100 to line management/operation level (Control System 2 - Info
board)
Weekly report failure F/100 incl. status follow ups of top 5 (paper/file)
QG Monthly report failure F/100 incl. failure tendency and target achievement as summary
report for Line Management and Top- Management. (paper/file)
any special reports if required, e.g. overview rework time at Control System 2