the rice mill to be tested shall be inspected to verify the manufacturer's specifications . a level and smooth surface shall be used as reference plane for verification of relevant dimensions . verification of some specifications shall be made before , during and after the test period . data or information on the drier shall be included in the report form given in annex iii