5.Change picture of adhesion test. (QA/QC)
6.Review all graph of parker supplier. (QA/QC)
7.Revised changing point (Phosphate and ED). (PD)
8.Revised hanger checksheet from record change to plan. (PD)
9.Revised emergency plan. (PD)
10.Change method check of temperature measure on actual parts in control plan. (QA/QC)
11.Revised control plan follow up TMAP comment. (QA/QC)