It has also been illustrated that the computed and measured water levels generally show fair agreement. It was believed that due to persistent rainfall, the drop in phreatic surface was not as great as predicted for suspension of pumping operation; espe-cially at locations near to the embankment toe despite suspension of sand-filling.