To installation the equipment with in the Server room, such as Electrical system and power lines, Basket tray(final check), Generator, UPS , Air condition, Access Control have been installed and now is in the process of being tested. Yesterday was the first time to test the electrical system of server room, to test electricity to equipment. Test the switching source power of main electrical power and generator. That results when using the source power from the main electrical to equipment inside the server room can work as well. But when they assume a power outage and the generator turns out that the main power supply compensation, results indicated that the power is not stable, Air condition can work normally but UPS there was alarm at all times.