2009. In the booting stage
[85 days after sowing (DAS)], soil water content (SWC) was adjusted to
56% (full irrigation or well watering),
25% (7 days withholding irrigation or mild water-deficit),
7% (14 days withholding irrigation or severe water-deficit)
and re-watering 3 days prior to grain harvesting.