I am regret to inform you that I am not available for the meeting. As a consultant in Xayaburi HPP project, my primary duty is to carry out all related geological works in the project for the client.
Last time we spent a lot of time for site visit at the resettlement area, attend the meeting as well as slope stability calculation check (without charging MM cost), and finally our recommendations
for slope stabilization were ignored.I think it is not fair for our client who need us to concentrate on the project if we continue to supervise the drilling work at the resettlement area.
As I informed previously in the meeting, after we get survey and geological investigation results, we can review the design of slope stabilization prepared by PT.
I hope you will understand my situation.