All bulk carbon steel pipe shall be prepared and primed in the shop with one coat of P01 Subsequent coats shall be applied in the field as appropriate in accordance with Section1.6 See note 12 for shop primed bulk carbon steel pipe that will be insulated and operate up to 120C
for bulk pipe, two coat system I shall be applied directly to the shop applied P01 promer.