The ability of the ship to be towed from bow and stern should be evaluated, and the
following items should be reviewed:
1 line handling procedures (passing and receiving messenger lines, towlines,
bridles); and
2 layout, structural adequacy and safe working loads of connection points
(fairleads chocks, winches, bitts, bollards), etc.