Parametric estimates base their predictions on design
parameters such as ship size, weight, horsepower, etc. Such
analyses use a mathematical relationship between input
parameter and cost that is historically determined through
regression analysis (i.e. Cost = f*(weight)). The cost
estimator using this system must be knowledgeable enough to
know when an adjustment factor is needed, and to know what
the factor should be.