METHOD STATEMENT FOR
CERAMIC FLOOR TILE WORKS
Table of Contents
1 INTRODUCTION 2
2 PURPOSE 2
3 SCOPE OF WORK 2
4 STANDARD 2
4.1 Project Specifications 2
4.2 Project Drawings 3
4.3 Reference Codes 3
5 RESOURCES 4
5.1 Ceramic Tile Materials 4
5.2 Equipments 4
6 SITE ORGANIZATION 5
7 WORK EXECUTION 6
7.1 Floor Preparation using Mortar Bed or Tile Adhesive 6
7.2 Laying Ceramic Tiles on a Mortar Bed or Adhesive Bed 7
7.3 Protection of Installed Ceramic Floor Tiles 9
7.4 Grouting and Sealing 10
7.5 Curing of Ceramic Tiles 10
8 QUALITY CONTROL PLAN 10
9 SAFETY PLAN 10
METHOD STATEMENT FOR
CERAMIC FLOOR TILE WORKS
1 INTRODUCTION
This method statement describes the Ceramic Floor Tile Works. This set of documents describes the procedure for the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1.
2 PURPOSE
To define the responsibilities, materials and equipment and describe the method to be used for Ceramic Floor Tile Works in the building of the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1.
3 SCOPE OF WORK
This method statement will apply for the architect works for Ceramic Floor Tile Works in the building of the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1.
4 STANDARD
4.1 Project Specifications
The Project Specification contains elements of the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1 Standard Specification – General Specification for Architectural Work Contracts and are applicable as necessary to the Works to be performed in accordance with Volume 7 (Book 4 of 4): The Specification of the Contract.
4.1.1 Section 3.1 FLOOR FINISHES
4.1.2 Section 3.1.9 CERAMIC FLOOR TILE
4.2 Project Drawings
The project drawings are applicable as necessary to the works to be performed in accordance with the Volume 6: The Drawing of the Contract. (Book 5,6,7,13,14,16 of 17 )
Drawing Number Title
TYP-T04-101 TO 104 TYPICAL AT BANG SUE GRAND STATION TYPICAL FLOOR DETAIL 1 TO 4
TYP-T04-101 TO 104 TYPICAL AT STATION TYPICAL FLOOR DETAIL 1 TO 4
4.3 Reference Codes
ASTM C 150 : 05 Standard specification for Portland Cement
BS 12 Portland Cement
BS 476 Fire Resistance of Building Materials and Element
BS 5385 pt4 Wall and Floor Tiling. Design & Installation of Internal and
External Ceramic Floor Tiles and Mosaics in Normal Condition.
Code of Practise
ANSI A 118.4 Latex Portland Cement Mortar
ANSI A 118.6 Ceramic Tile Grouts
ANSI A 137.1 Ceramic Tile
Tile Council of America (TCA) - Handbook for Ceramic Tile Installation
TIS 37-2516 Grade A Flooring Tiles
TIS 37 -2529 Grade A Flooring Tiles
TIS 38 -2531 Grade A Flooring Tiles
5 RESOURCES
5.1 Ceramic Tile Materials
• Portland Cement refer to Doc. No. RLBR-1/CSC/039/56091801
• Fine sand
• Potable Water
• Bonding agents refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Admixtures refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Tile Adhesive refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Ceramic Tiles refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Grout refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Flexible Sealant refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Sealer refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Cleaner
5.2 Equipments
• Steel trowel
• Notched steel trowel
• Mortar Mixer, Paddle
• Bucket
• Lighting Fixture
• Personal protective equipment
• Broom
• Water Hose
• Water Brush
• Shape Template
• Suction Pad
• String Line
• Rubber Hammer & Mallet
• Level
• Straight Edge screed
• Diamond Tipped Blade, Electric Saw,Power Cutting Saw
• Scribe Tile Cutting Machine
• Sponge
• Cleaning cloth
• Sealant Applicator
• Jointing Tool
• Tape Measure
• Concrete Nails
6 SITE ORGANIZATION
(Refer to Project Site Organization)
7 WORK EXECUTION
7.1 Floor Preparation using Mortar Bed or Tile Adhesive
7.1.1 Clean the surface and remove any dust, contaminated materials on structure base and substrates for direct application of mortar or adhesive, removing loose material and substances that may impair the work. Obstruction shall be removed or trimmed back even with the surface of the solid base.
7.1.2 Where mortar or adhesive is to be continued without break across joints between dissimilar solid backgrounds which are in the same plane, cover joints with 200mm wide metal mesh as specified & approved fixed with corrosion resistant fasteners at not more than 600mm centers along both edges, apply mesh over electro-mechanical embedded conduits.
7.1.3 Repair all holes in the floor or wall surfaces by filling with mortar to ensure the base surface is uniform. Surface Repair Mix: 2 volume parts Portland cement to 3 volume parts fine sand, 1 part bonding agent to 3 part clean water mixed to a mushy-paste consistency shall be left untraveled, undisturbed and moist cured for at least 12 hours after application and before mortar or adhesive application.
7.1.4 Before laying mortar bed, spray water with bonding agent to all surfaces to receive mortar.
7.1.5 Set finished levels round the parameter of the area to be mortared or glued, to ensure surface level of finished mortar or adhesive bed is correct level to receive tiles.
7.1.6 For installing mortar bed the thickness should be a minimum15mm thick mortar bed to area to receive tiles. On floors, leave a 5mm expansion gap from all walls for expansion. Maintain moisture content of the mortar as semi dry.
7.2 Laying Ceramic Tiles on a Mortar Bed or Adhesive Bed
7.2.1 Set out the area to be tiled according to the approved shop drawing and or bond to ensure maximum use of full tiles.
7.2.2 Line up with String Line to path the laying ceramic tiles as for level approved by Engineer.
7.2.3 Check slope for drainage as required.
7.2.4 For Mortar beds, sprinkle neat cement on the premix mortar bed whilst the mortar is still moist. For adhesive, spread the adhesive with a notched trowel evenly. Lay the tiles onto the mortar bed or tile adhesive by using a rubber mallet or hand pressure to force the ceramic tile into the mortar bed or adhesive to the desired level by applying even pressure to the ceramic tile surface.
7.2.5 The ceramic tiles must be laid to ensure even joint lines and levels. Use tile spacers as required to maintain even spacing of tiles.
7.2.6 Laid ceramic tiles must have fully mortar, no void under the tile. When knock the tile, it should has no resonant sound.
7.2.7 Use an Electric Power Saw fitted with a system Diamond Tipped Blade or tile scoring machine to cut the tile for openings, fitting to walls and penetrations.
7.2.8 Ensure that the surface level of the ceramic tile remains flat and smooth with no more than 6mm in 3m for horizontal surfaces and 3mm in 6mm in 2.4m for vertical surfaces.
7.3 Protection of Installed Ceramic Floor Tiles
7.3.1 During the ceramic tile laying process, make sure that the tile surface is regularly swept clean with a broom.
7.3.2 During installation of ceramic tiles, the work area and finished work area should be remain protected from traffic until the grouting and sealing process are completed.
7.3.3 Fully Grouted Installed work or drainage pipe by non shrink grout should be protected from traffic for at least 72 hours.
7.4 Grouting and Sealing
7.4.1 Once the ceramic tiles are laid clean the surface and remove grit from the joints.
7.4.2 Fill the joints with grout. Care must be taken to ensure that all voids are filled. It is important that the colour remains constant throughout the process by batching the grout correctly.
7.4.3 Once the grout has dried sufficiently, clean the residue grout from the ceramic tile surface.
7.4.4 When the ceramic tiles abut another material, it is best to fill the joint with a suitable flexible sealant.
7.5 Curing of Ceramic Tiles
7.5.1 Keep the tiles damp after laying for curing for at least 72 hours (3 days).
7.5.2 Cover the tiles during this curing process with suitable 40 pound Kraft paper or similar.
8 QUALITY CONTROL PLAN
Quality Control Plan shall be submitted separately.
9 SAFETY PLAN
Safety Plan shall be submitted separately.
METHOD STATEMENT FOR
CERAMIC FLOOR TILE WORKS
Table of Contents
1 INTRODUCTION 2
2 PURPOSE 2
3 SCOPE OF WORK 2
4 STANDARD 2
4.1 Project Specifications 2
4.2 Project Drawings 3
4.3 Reference Codes 3
5 RESOURCES 4
5.1 Ceramic Tile Materials 4
5.2 Equipments 4
6 SITE ORGANIZATION 5
7 WORK EXECUTION 6
7.1 Floor Preparation using Mortar Bed or Tile Adhesive 6
7.2 Laying Ceramic Tiles on a Mortar Bed or Adhesive Bed 7
7.3 Protection of Installed Ceramic Floor Tiles 9
7.4 Grouting and Sealing 10
7.5 Curing of Ceramic Tiles 10
8 QUALITY CONTROL PLAN 10
9 SAFETY PLAN 10
METHOD STATEMENT FOR
CERAMIC FLOOR TILE WORKS
1 INTRODUCTION
This method statement describes the Ceramic Floor Tile Works. This set of documents describes the procedure for the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1.
2 PURPOSE
To define the responsibilities, materials and equipment and describe the method to be used for Ceramic Floor Tile Works in the building of the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1.
3 SCOPE OF WORK
This method statement will apply for the architect works for Ceramic Floor Tile Works in the building of the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1.
4 STANDARD
4.1 Project Specifications
The Project Specification contains elements of the Construction of Mass Transit System Project in Bangkok (Red Line) (I) Project Contract1 Standard Specification – General Specification for Architectural Work Contracts and are applicable as necessary to the Works to be performed in accordance with Volume 7 (Book 4 of 4): The Specification of the Contract.
4.1.1 Section 3.1 FLOOR FINISHES
4.1.2 Section 3.1.9 CERAMIC FLOOR TILE
4.2 Project Drawings
The project drawings are applicable as necessary to the works to be performed in accordance with the Volume 6: The Drawing of the Contract. (Book 5,6,7,13,14,16 of 17 )
Drawing Number Title
TYP-T04-101 TO 104 TYPICAL AT BANG SUE GRAND STATION TYPICAL FLOOR DETAIL 1 TO 4
TYP-T04-101 TO 104 TYPICAL AT STATION TYPICAL FLOOR DETAIL 1 TO 4
4.3 Reference Codes
ASTM C 150 : 05 Standard specification for Portland Cement
BS 12 Portland Cement
BS 476 Fire Resistance of Building Materials and Element
BS 5385 pt4 Wall and Floor Tiling. Design & Installation of Internal and
External Ceramic Floor Tiles and Mosaics in Normal Condition.
Code of Practise
ANSI A 118.4 Latex Portland Cement Mortar
ANSI A 118.6 Ceramic Tile Grouts
ANSI A 137.1 Ceramic Tile
Tile Council of America (TCA) - Handbook for Ceramic Tile Installation
TIS 37-2516 Grade A Flooring Tiles
TIS 37 -2529 Grade A Flooring Tiles
TIS 38 -2531 Grade A Flooring Tiles
5 RESOURCES
5.1 Ceramic Tile Materials
• Portland Cement refer to Doc. No. RLBR-1/CSC/039/56091801
• Fine sand
• Potable Water
• Bonding agents refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Admixtures refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Tile Adhesive refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Ceramic Tiles refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Grout refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Flexible Sealant refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Sealer refer to Section 3.1.9 Ceramic Floor Tile in Vol.7 (Book 4 of 4)
• Cleaner
5.2 Equipments
• Steel trowel
• Notched steel trowel
• Mortar Mixer, Paddle
• Bucket
• Lighting Fixture
• Personal protective equipment
• Broom
• Water Hose
• Water Brush
• Shape Template
• Suction Pad
• String Line
• Rubber Hammer & Mallet
• Level
• Straight Edge screed
• Diamond Tipped Blade, Electric Saw,Power Cutting Saw
• Scribe Tile Cutting Machine
• Sponge
• Cleaning cloth
• Sealant Applicator
• Jointing Tool
• Tape Measure
• Concrete Nails
6 SITE ORGANIZATION
(Refer to Project Site Organization)
7 WORK EXECUTION
7.1 Floor Preparation using Mortar Bed or Tile Adhesive
7.1.1 Clean the surface and remove any dust, contaminated materials on structure base and substrates for direct application of mortar or adhesive, removing loose material and substances that may impair the work. Obstruction shall be removed or trimmed back even with the surface of the solid base.
7.1.2 Where mortar or adhesive is to be continued without break across joints between dissimilar solid backgrounds which are in the same plane, cover joints with 200mm wide metal mesh as specified & approved fixed with corrosion resistant fasteners at not more than 600mm centers along both edges, apply mesh over electro-mechanical embedded conduits.
7.1.3 Repair all holes in the floor or wall surfaces by filling with mortar to ensure the base surface is uniform. Surface Repair Mix: 2 volume parts Portland cement to 3 volume parts fine sand, 1 part bonding agent to 3 part clean water mixed to a mushy-paste consistency shall be left untraveled, undisturbed and moist cured for at least 12 hours after application and before mortar or adhesive application.
7.1.4 Before laying mortar bed, spray water with bonding agent to all surfaces to receive mortar.
7.1.5 Set finished levels round the parameter of the area to be mortared or glued, to ensure surface level of finished mortar or adhesive bed is correct level to receive tiles.
7.1.6 For installing mortar bed the thickness should be a minimum15mm thick mortar bed to area to receive tiles. On floors, leave a 5mm expansion gap from all walls for expansion. Maintain moisture content of the mortar as semi dry.
7.2 Laying Ceramic Tiles on a Mortar Bed or Adhesive Bed
7.2.1 Set out the area to be tiled according to the approved shop drawing and or bond to ensure maximum use of full tiles.
7.2.2 Line up with String Line to path the laying ceramic tiles as for level approved by Engineer.
7.2.3 Check slope for drainage as required.
7.2.4 For Mortar beds, sprinkle neat cement on the premix mortar bed whilst the mortar is still moist. For adhesive, spread the adhesive with a notched trowel evenly. Lay the tiles onto the mortar bed or tile adhesive by using a rubber mallet or hand pressure to force the ceramic tile into the mortar bed or adhesive to the desired level by applying even pressure to the ceramic tile surface.
7.2.5 The ceramic tiles must be laid to ensure even joint lines and levels. Use tile spacers as required to maintain even spacing of tiles.
7.2.6 Laid ceramic tiles must have fully mortar, no void under the tile. When knock the tile, it should has no resonant sound.
7.2.7 Use an Electric Power Saw fitted with a system Diamond Tipped Blade or tile scoring machine to cut the tile for openings, fitting to walls and penetrations.
7.2.8 Ensure that the surface level of the ceramic tile remains flat and smooth with no more than 6mm in 3m for horizontal surfaces and 3mm in 6mm in 2.4m for vertical surfaces.
7.3 Protection of Installed Ceramic Floor Tiles
7.3.1 During the ceramic tile laying process, make sure that the tile surface is regularly swept clean with a broom.
7.3.2 During installation of ceramic tiles, the work area and finished work area should be remain protected from traffic until the grouting and sealing process are completed.
7.3.3 Fully Grouted Installed work or drainage pipe by non shrink grout should be protected from traffic for at least 72 hours.
7.4 Grouting and Sealing
7.4.1 Once the ceramic tiles are laid clean the surface and remove grit from the joints.
7.4.2 Fill the joints with grout. Care must be taken to ensure that all voids are filled. It is important that the colour remains constant throughout the process by batching the grout correctly.
7.4.3 Once the grout has dried sufficiently, clean the residue grout from the ceramic tile surface.
7.4.4 When the ceramic tiles abut another material, it is best to fill the joint with a suitable flexible sealant.
7.5 Curing of Ceramic Tiles
7.5.1 Keep the tiles damp after laying for curing for at least 72 hours (3 days).
7.5.2 Cover the tiles during this curing process with suitable 40 pound Kraft paper or similar.
8 QUALITY CONTROL PLAN
Quality Control Plan shall be submitted separately.
9 SAFETY PLAN
Safety Plan shall be submitted separately.
การแปล กรุณารอสักครู่..
วิธีประกาศ กระเบื้องเซรามิกชั้นทำงาน
สารบัญ
1
2 วัตถุประสงค์เบื้องต้น 2 2
3 ขอบเขตของมาตรฐาน 2
4 งาน กำหนดโครงการ 2
2
4.2 4.1 วาดโครงการ 3
3
5 วัสดุอ้างอิงรหัส 4.3 5.1 เซรามิคทรัพยากร 4
4
4
6 5.2 อุปกรณ์องค์กร 5 เว็บไซต์
7
7 ชั้น 6 งานปฏิบัติการการเตรียมการใช้เตียงปูนหรือกาวซีเมนต์ 6
72 การวางกระเบื้องเซรามิกบนเตียงหรือเตียงปูนกาว การติดตั้งกระเบื้อง 7.3 7
9
7.4 Grouting และปิดผนึก 10
7.5 การแข็งตัวของกระเบื้องเซรามิก 10
8 แผนคุณภาพควบคุม 10
9 แผนความปลอดภัย 10 วิธี
งบสำหรับพื้นกระเบื้องเซรามิคงาน
1
งบเบื้องต้นวิธีนี้อธิบายพื้นเซรามิค งานปูพื้นกระเบื้องเซรามิกเอกสารชุดนี้อธิบายขั้นตอนการก่อสร้างโครงการระบบรถไฟฟ้าขนส่งมวลชน ในเขตกรุงเทพมหานคร ( เส้นสีแดง ) ( ฉัน ) contract1 โครงการ
2 วัตถุประสงค์เพื่อกำหนดความรับผิดชอบ และวัสดุอุปกรณ์ต่างๆ และอธิบายถึงวิธีการที่จะใช้สำหรับพื้นกระเบื้องเซรามิค ทำงานในตึกของการก่อสร้างโครงการระบบขนส่งมวลชนในเขตกรุงเทพมหานคร ( เส้นสีแดง ) ( ผม )
contract1 โครงการ3 ขอบเขตของงาน
สั่งวิธีนี้จะใช้สำหรับสถาปนิกสำหรับงานปูพื้นกระเบื้องเซรามิก ทำงานในตึกของการก่อสร้างโครงการระบบรถไฟฟ้าขนส่งมวลชน ในเขตกรุงเทพมหานคร ( เส้นสีแดง ) ( ฉัน ) contract1
4 โครงการ โครงการกำหนดมาตรฐาน
.
การวางสเปคโครงการประกอบด้วยการก่อสร้างโครงการระบบรถไฟฟ้าขนส่งมวลชน ในเขตกรุงเทพมหานคร ( เส้นสีแดง ) ( ฉัน ) โครงการ contract1 มาตรฐานข้อกำหนดทั่วไปสำหรับงานสถาปัตยกรรมและข้อกำหนดสัญญา และใช้เท่าที่จำเป็นเพื่องานที่จะดำเนินการตามหมวด 7 ( เล่ม 4 4 ) : ข้อกำหนดของสัญญา
4.1.1 . ส่วน 3.1 พื้นเสร็จ
4.1 .หมวด 3.1.9 ปูพื้นกระเบื้อง
4.2 โครงการวาด
ภาพวาดโครงการ เฉพาะเท่าที่จำเป็นเพื่องานที่จะปฏิบัติให้สอดคล้องกับหมวดที่ 6 : การวาดภาพของสัญญา ( หนังสือ 5,6,7,13,14,16 17 )
วาดหมายเลขชื่อ
typ-t04-101 104 ปกติที่บางซื่อสถานีแกรนด์ทั่วไปชั้น 4
1 รายละเอียดtyp-t04-101 104 ทั่วไปที่สถานีโดยทั่วไปพื้นรายละเอียด 1
4.3 อ้างอิงรหัส
ASTM C 150 : 05 มาตรฐานสำหรับปูนซีเมนต์ปอร์ตแลนด์ ปูนซีเมนต์ปอร์ตแลนด์
BS 12 BS 476 ทนไฟของวัสดุก่อสร้างและองค์ประกอบ
BS 5385 pt4 พื้นและผนังปูกระเบื้อง ออกแบบ&ติดตั้งภายในและภายนอกปูพื้นกระเบื้องโมเสคเซรามิค
และในภาวะปกติ
โค้ด ANSI ของฝึกเป็น 118 .4 ยางปูนซีเมนต์ปูน
ANSI เป็น 118.6 กระเบื้องเซรามิกเช่น ANSI เป็น 137.1
กระเบื้องเซรามิกกระเบื้องแห่งอเมริกา ( TCA ) - คู่มือการติดตั้งกระเบื้องเซรามิกกระเบื้องเกรด มอก. 37-2516
พื้นมอก. 37 - 2529 เกรด A กระเบื้อง
พื้นมอก. 38 - 2531 เกรด A พื้นกระเบื้อง
5 ทรัพยากร
5.1 เซรามิค บริการ
กระเบื้องวัสดุปูนซีเมนต์เรียกหมอ ไม่ rlbr-1 / CSC / 039 / 56091801
ทรายดี - -
- น้ำสะอาด bonding ตัวแทนอ้างถึงมาตรา 3.1.9 กระเบื้องพื้นกระเบื้องใน vol.7 ( เล่ม 4 4 )
- โดยอ้างอิงถึงส่วน 3.1.9 กระเบื้องพื้นกระเบื้องใน vol.7 ( เล่ม 4 4 )
- กาวซีเมนต์อ้างอิงถึงส่วน 3.1.9 กระเบื้องพื้นกระเบื้องใน vol.7 ( หนังสือ 4
4 ) - กระเบื้องเซรามิกอ้างอิงถึงส่วน 3.1.9 กระเบื้องพื้นกระเบื้องใน vol.7 ( เล่ม 4 4 )
- แนวอ้างอิงถึงส่วน 3.1 .กระเบื้องเซรามิกชั้น 9 ใน vol.7 ( เล่ม 4 4 )
- ยืดหยุ่นกาวอ้างอิงถึงส่วน 3.1.9 กระเบื้องพื้นกระเบื้องใน vol.7 ( เล่ม 4 4 )
- ซีลอ้างอิงถึงส่วน 3.1.9 กระเบื้องพื้นกระเบื้องใน vol.7 ( เล่ม 4 4 )
-
5.2 อุปกรณ์ทำความสะอาด
-
- เกรียงเหล็ก หยักเหล็กเกรียง
-
- ปูนผสมใบพัดถัง
-
- แสงที่ติดตั้งอุปกรณ์ป้องกันส่วนบุคคล
-
- ไม้กวาด สายยาง
น้ำแปรง -
-
- รูปร่างแม่แบบดูดแผ่น
-
- สตริงสายค้อนค้อนยาง&ระดับ
-
-
- ตรงขอบหยาบเพชรปลายใบมีดไฟฟ้าเห็นไฟฟ้า , เลื่อยตัด
-
- เครื่องตัดกระเบื้องเสมียนฟอง
บริการทำความสะอาดผ้า
-
- ไม่ใช้เครื่องมือ applicator กาวเทปวัด
-
- ตะปูคอนกรีต
6 เว็บไซต์องค์กร
( อ้างถึงองค์กรเว็บไซต์โครงการ )
การแปล กรุณารอสักครู่..