CB Wall Work.
Install Siding Sheet.
Rebar Slab Work, CB Wall Toilet 2, Dock Leveler Work.
Erection Siding Pipe Reck.
LGS Wall Work, Plastering Wall Work Utility Area.
Install Pu ding Oil Tank Yard.
Install Conduit & Wiring Cable at Utility Area.
Install Conduit in Gym sum Wall Office.
Safety Patrol and Document Work.
Casting Gutter & Curb. And Document Work.
Mark Line Toilet Office & Truck Scale.
Casting Concrete Pavement & Curb.
Shop DWG Main Gate.
Document Work.