These values then can be used as upper bounds for the traffic situation in a shutdown scenario and a candidate cell can be detached, if the
individual load factor values of all participating cells fall below
the calculated values. Otherwise, the cell breathing effect of
cells in an energy saving scenario may lead to failed connection
setups or dropped connections [17],[6]. In our future work we
will address these issues in more detail.