For the kickoff meeting, I prefer to have it be done through either a radio or satellite phone call – not by emailing.
If you can call me before 6 pm today, I can do it with you. But if the call is later than 6 pm, I can assign the nightshift lead production operator to handle it instead.
At present, JKWH has no activities as having problem with the Thunder Crane TC-70 boom and waiting for a long-deck supply boat to backload it to SKL for a repair – WoW for this non-routine lifting!
FE construction team also has the reflector plate ready on the platform – pending installation to support your planned platform ROV survey. But I think this should not involve with your planned gas bubble survey tonight through tomorrow – please confirm.