The details for installation Air Dryer
MDF production department has installed 4 units Air compressor. Run 3 units standby 1 unit and run with 2 units Air dryer to isolate water from air to get dry before go to production line. But right now MDF has been run higher capacity are 1000 M3/day must run all full 4 Air compressor. Cause to Air compressor full capacity cannot stop for short while in case one Air dryer stop and Air was contaminate with water become wet then big impact to control valve.
On behalf of Engineering and Maintenance department, we agreed to purchase the Air dryer to solve problem of the equipment damaged and reduce the downtime in case of moisture in the air compressor.