With reference to monthly meeting dated 4 October 2016 GE informed that the anchor bolts details of 230 kV steel structures would be confirmed within the week as long as no modification to structure. Remaining information is of take-off structure and circuit breaker. Please expedite confirmation so that the relating shop drawings can be continued.