the above diagram presents the volume of wastewater and process cooling water at
the individual sites per m3
/ton of fiber or pulp manufactured. The water consumed by
ancillary equipment, such as an on-site power plant, is included in the calculation.
The water supply and wastewater treatment at the Lenzing facility pertain not just to pulp and
fiber production but also to enterprises not covered by this Sustainability Report. Only the
water consumed for pulp and fiber production and for associated power production is taken
into account in this report