For this study, the capital cost is assumed to be 1500USD/kW because the plant is considered to be run of river and additional components such as a battery bank
and converters, each costing almost 1000USD/kW are not taken into consideration in the hybrid system configuration. The operating and maintenance costs
are assumed to be 90USD and the life span 25 years